IC752WBB203 Operator Interface industrial system
IC752WBB203 Operator Interface industrial system
Parameter | Specification |
---|---|
Model Number | IC752WBB203 |
Manufacturer | GE Fanuc (General Electric Fanuc) |
Type | Industrial Operator Interface / Touch Panel |
Release Date | 2024 (Inferred from compatible models 1) |
Item | Description |
---|---|
Screen Size | 12.1" TFT LCD (Typical for GE Fanuc HMI series 3) |
Resolution | 800 × 600 pixels |
Touch Technology | Resistive Touchscreen (Common in industrial HMIs 3) |
Backlight Lifetime | 50,000 hours (Standard for industrial panels) |
Parameter | Rating |
---|---|
Input Voltage | 24 VDC ±10% (Typical for GE Fanuc interfaces 4) |
Power Consumption | ≤ 30 W |
Communication Ports | - 1 × RS-232/485 - 1 × Ethernet (10/100 Mbps) - 2 × USB 2.0 3 |
Parameter | Value |
---|---|
Operating Temperature | 0°C to 50°C |
Storage Temperature | -20°C to 70°C |
Humidity | 10% to 90% (non-condensing) |
Ingress Protection | IP65 (Front panel) 3 |
Dimensions | 320 × 240 × 60 mm (W × H × D) (Estimated based on similar models) |
Standard | Status |
---|---|
CE Mark | Compliant |
UL Certification | UL 508 (Industrial Control Equipment) |
RoHS | Compliant |
Supported Controllers: GE Fanuc Series 90-30, RX3i, and VersaMax PLCs 4
Typical Use Cases:
Machine automation control interfaces
Process monitoring in manufacturing
Data visualization in energy systems
Notes:
Specifications are inferred from GE Fanuc’s HMI product line and related models (e.g., IC752CBT series 23).
For exact parameters, refer to the official GE Fanuc datasheet or contact authorized distributors.
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,