GE 705-1512-01 Control system bus unit
GE AT868 AT868-1-1-2-0 Ultrasonic Flow Transmitter for Water
Each Panametrics instrument is warranted to be free from defects in
materials and workmanship. Liability under this warranty is limited to
servicing an instrument returned to the factory for that purpose and/or
replacing any defective parts. Fuses, batteries, and cables are
specifically excluded from any liability. This warranty is effective for
one year from the date of delivery to the original purchaser, provided
the instrument has been installed and operated in the manner
described in this Startup anual. Panametrics must determine that the
instrument was defective for this warranty to be valid. If damage is
determined to have been caused by misuse or abnormal conditions of
operation, the owner will be notified and approved repairs will be
billed at standard rates.
The Model AT868 also provides a second pair of outputs per channel (designated as Output B and Output D) that can
be configured as a totalizer or frequency output.
Like the analog outputs, these outputs can also be configured independently, Typically, Output B is used for Channel 1
and Output D is used for Channel 2. However, each output can be configured to measure either channel. Figure /
below shows a sample wiring diagram of a totalizer and frequency output circuit.
AT868-1-1-1
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,