Foxboro SCADA SCD2200 PS-12 Power Supply Modules
Foxboro SCADA SCD2200 PS-12 Power Supply Modules
• PS-12 AC Input Power Supply
◦ 90 to 260 VAC input, from 48 to 62 Hz, with battery charger providing 12 VDC
floating connection
◦ Also supports 96 to 340 VDC
◦ Supplies 5A of output current to a 5V backplane
◦ Total output power is linearly derated to 30 W from +65°C to +85°C (derating
factor is 1.5 W/°C above +65°C)
◦ 5 VDC output is linearly derated to 4.0 A from +60°C to +85°C (derating factor is
40 mA/°C above +60°C)
◦ 24 VDC output is linearly derated to 100 mA from +70°C to +85°C (derating factor
is 10 mA/°C above +70°C)
• PS-22 DC Input Power Supply
◦ 24 VDC input, positive/negative/floating grounded, with battery charger providing
12 VDC floating connection
◦ 5 VDC output is linearly derated to 4.0 A from +60°C to +85°C (derating factor is
40 mA/°C above +60°C)
◦ 24 VDC output is linearly derated to 100 mA from +70°C to +85°C (derating factor
is 10 mA/°C above +70°C)
• PS-BP DC Input Power Supply
◦ 10 60 VDC / 10 A input, generates stable voltages for the 5V-rail and for the 12Vrail
from the supplied VIN voltage.
◦ The efficiency of the PS-BP converter decreases slightly at higher input voltages
therefore its maximum output power must be de-rated at high temperatures if
used in systems with high-voltage power sources (48 VDC and above).
• Isolation Tests Performed
◦ Voltage isolation
– Common mode:
1,500 V - single pulse 1.2 μs/50 μs
– Differential mode:
1,500 V - single pulse 1.2 μs/50 μs
◦ Isolation resistance
> 100 MΩ
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,