VMIPMC-5790 PMC Dual-Channel Ultra160 SCSI Host Adapter
VMIPMC-5790 PMC Dual-Channel Ultra160 SCSI Host Adapter
The VMIPMC-5790 is an Dual-Channel Ultra160 SCSI Host Adapter built around the
LSI Symbios® SYM53C1010 highly integrated PCI Dual-Channel Ultra160 SCSI
controller. The IC is ideal for embedded applications that require high throughput.
The VMIPMC-5790 maximizes throughput while minimizing transfer latency and
host processor overhead. The host BIOS configures the VMIPMC-5790 as two
independent Ultra160 SCSI channels.
The two independent Ultra160 channels support wide Ultra160 SCSI synchronous
transfer rates up to 160 Mbyte/s on a Low Voltage Differential (LVD) SCSI bus.
Integrated LVDlink™ transceivers support both LVD and single-ended signals with
no external transceivers required. Fast SCSI, Ultra SCSI, Ultra2 SCSI, and Ultra160
SCSI are all supported by the VMIPMC-5790. The 8 Kbyte of internal RAM per
channel for SCRIPTS™ instruction storage allow all accesses to remain internal,
reducing the time spent on the PCI bus. A 944-byte DMA FIFO on each channel
allows the VMIPMC-5790 to efficiently burst up to 512 bytes across the PCI bus. SCSI
bus phase mismatches are handled in SCRIPTS, reducing CPU utilization.
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,