V7865-ACC-603-RC VME Transition Module
V7865-ACC-603-RC VME Transition Module
GE Fanuc
• Up to 1.26 GHz Pentium® III processor with 256 KB advanced
transfer cache
• Up to 512 MB PC-133 SDRAM using a single SODIMM
• Internal AGP SVGA controller with 4 MB display cache
• 133 MHz system bus via Intel® 815E chipset
• Dual Ethernet controllers supporting 10BaseT and 100BaseTX
interfaces
• Optional PCI dual channel Ultra160 SCSI
• Up to three (two with rear I/O support) PMC expansion sites
(IEEE-P1386 common mezzanine card standard, 5 V)
• Up to 1 GB bootable flash on secondary IDE (optional)
• Two 16-bit and two 32-bit programmable timers
• 32 KB of nonvolatile SRAM
• Software-selectable watchdog timer with reset
• Remote Ethernet booting
• Optional IDE hard disk drive
• VME64 modes supported:
A32/A24/D32/D16/D08(EO)/MBLT64/BLT32
• VMEbus interrupt handler, interrupter and system controller
• Includes real time endian conversion hardware for littleendian
and big-endian data interfacing (patent no. 6,032,212)
• Enhanced bus error handling
• Passive heat sink
• Ultra DMA/100 hard drive and floppy drive controllers (uses
VMEbus P2 for external connection to primary channel
IDE/floppy)
• Two high performance 16550-compatible serial ports
• Enhanced parallel port with ECP/EPP modes supported
• PS/2-style keyboard and mouse ports on front panel
• Real time clock and miniature speaker included
• Dual front panel univeral serial bus (USB) connections
• Operating system support for Windows® XP, Wind
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,