IS215WETAH1B IS215WETAH1CA WETA - Wind Topbox A Module
IS215WETAH1B IS215WETAH1CA WETA - Wind Topbox A Module
Mark* VIe is a flexible control system for multiple applications. It features highspeed,
networked I/O for simplex, dual, and triple redundant systems. Industrystandard
Ethernet communications are used for I/O, controllers, and supervisory
interface to operator and maintenance stations, and third-party systems.
ToolboxST* is used for Mark VIe and related controls as a common software
platform for programming, configuring I/O, trending, and analyzing diagnostics. It
provides a single source of quality, time-coherent data at the controller and plant
level for effectively managing equipment assets.
Every application has different requirements for redundancy depending on the
importance of the process. Mark VIe provides a wide range of redundancy options
that can be supplied in virtually any combination and mounted local or remote. Some
of these redundancy options include:
• Power sources and supplies single, dual, and triple
• Controllers (main processor) single, dual, and triple
• I/O network redundancy single, dual, and triple
• I/O packs per terminal board single, dual, and triple
• Ethernet Ports / I/O pack single or dual
Controllers are continuously online and read input data directly from IONet. Dual
redundant systems transmit inputs from one or redundant I/O packs on dual IONets
to dual controllers. Outputs are transmitted to an output I/O pack that selects either
the first healthy signal or the signal of choice. Three output packs can be provided to
vote output signals for mission-critical field devices.
Dual redundant systems can be configured for single, dual, and triple sensors. Their
dual internal networks and controllers keep the process online if a controller or
power supply fails. Triple redundant systems are available to protect against soft or
partial failures of devices that continue to run but with incorrect signals/data.
These systems out vote a failed component with a 2-out-of-3 selection of the signal.
Application software in all three controllers runs on the voted value of the signal
while diagnostics identify the failed device. These sophisticated diagnostics
minimize the mean-time-to-repair (MTTR) while the on-line repair capability
maximizes the mean-time-between-forced-outages (MTBFO). Field sensors for these
systems can be single, dual, or triple.
A second controller can be provided to separate the application software for different
pieces of equipment. For example, a core engine control for an air-fuel governor can
run in one controller while a second controller can be dedicated to auxiliary control.
--------------------------------------------------------
IS220PCAAH1A IS220PCAAH1B Core Analog Input/Output for Heavy Duty Gas Turbines
IS220PCLAH1A IS220PCLAH1B Core analog input/output for aeroderivative turbines
IS220PSVOH1A IS220PSVOH1B Servo Control: 2 Outputs, 8 LVDTs and 2 Pulse Rate Inputs
IS220PTURH1A IS220PTURH1B Turbine Input/Output: Primary Turbine Protection
IS220PPRAS1A-HIA IS220PPRAS1B Turbine Input/Output: Turbine Backup Protection
IS220PPROH1A IS220PPROH1B Turbo Input/Output: Turbo Backup Protection
IS215AEPCH2F AEPC - 30Nm Non-CANBus Air Distance Control (Center/Axle)
IS215AEPCH1C IS215AEPCH1F AEPC - 30Nm Air Distance Control (Center/Shaft)
IS215AEPCH1A IS215AEPCH1D AEPC -20Nm Non-ESS Air Distance Center Control
IS215AEPCH1B IS215AEPCH1E AEPC - 20Nm ESS Air Distance Center Control
IS215AEPAH1A IS215AEPAH1C AEPA - 20Nm Air Distance Axle Control
IS215WEPAH1A IS215WEPAH1B WEPA - 30Nm CANBus Air Distance Axle Control
IS215WEPAH2A IS215WEPAH2B WEPA - 30Nm Non-CANBus Air Distance Axle Control
IS215WETAH1B IS215WETAH1CA WETA - Wind Topbox A Module
IS215WEMAH1A IS215WEMAH1BA WEMA - Wind Master Cabinet "A" (DTA)
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,