DeltaV Bulk Power Supply 100-240 V AC to 12 V DC, 15A VE5137
DeltaV Bulk Power Supply 100-240 V AC to 12 V DC, 15A VE5137
Power — your system won’t operate without it. DeltaV™ Bulk
Power Supplies offer you the most efficient and reliable power
solution for your money. The DeltaV Bulk Power Supply suite
provides power to the system electronics and to the field.
This is all the power required for your DeltaV system.
The DeltaV distributed control system (DCS) improves your operations by harnessing today’s predictive technologies in an easy, intuitive, and interoperable way to connect
your people, processes, and production. The DeltaV DCS provides systems and tools
to provide the decision integrity to run your operation at its full potential. Emerson designed the DeltaV DCS to simplify tasks throughout the lifetime of your facility.
--------------------------------------
2 x DO Card, 8 Ch, High Side, Redundant Discrete 8-Channel Terminal Block. SE4032S1T2B1
DO Card: 8 channels 24V DC, Isolated, 8-Channel Terminal Block. SE4002S1T1B1
DO Card: 8 channels 24V DC, Isolated, Fused 8-Channel Terminal Block. SE4002S1T1B2
DO Card: 8 channels 24V DC, Isolated, 16-Pin Mass Terminal Block. SE4002S1T1B3
DO Card, 32 channels, 24V DC, High Side, Discrete 32-Channel Terminal Block. SE4002S1T2B5
DO Card, 32 channels, 24V DC, High Side, 40-Pin Mass I/O Terminal Block
(to be used with P+F HiD or HiC IS barriers and termination boards for DeltaV DCS).
SE4002S1T2B6
DO Card: 32 channels, 24V DC, High Side, 40-Pin Mass I/O Terminal Block
including 4 x 8-channel DO Mass Connection Boards*.
SE4052S1T2B6
2 x DO Plus Card, 32 channels, 24V DC, High Side, 40-Pin DO Mass I/O Terminal Block
(to be used with P+F HiD or HiC IS barriers and termination boards for DeltaV DCS).
SE4032S1T2B8
2 x DO Plus Card: 32 channels, 24V DC, High Side, 40-Pin DO Mass I/O Terminal Block
including 4 x 8-channel DO Mass Connection Boards*.
SE4082S1T2B8
DI Card: 8 channels, 120V AC, Isolated, 8-Channel Terminal Block
(1 Power Terminal Plug incl. for dedicated to disconnect 24V DC Power supply through
the 8-Wide I/O Carrier).
SE4001S3T1B1
DI Card: 8 channels, 120V AC, Isolated, Fused 8-Channel Terminal Block
(1 Power Terminal Plug incl. to disconnect 24V DC Power supply through the 8-Wide I/O Carrier).
SE4001S3T1B2
DI Card: 8 channels, 120V AC, Dry Contact, 8-Channel Terminal Block
(1 Power Terminal Plug incl. for dedicated Power supply through the 8-Wide I/O Carrier).
SE4001S3T2B1
DI Card: 8 channels, 120V AC, Dry Contact, Fused 8-Channel Terminal Block
(1 Power Terminal Plug incl. for dedicated Power supply through the 8-Wide I/O Carrier).
SE4001S3T2B2
DO Card: 8 channels 120V/230V AC, Isolated, 8-Channel Terminal Block
(1 Power Terminal Plug incl. to disconnect 24V DC Power supply through the 8-Wide I/O Carrier).
SE4002S2T1B1
DO Card: 8 channels 120V/230V AC, Isolated, Fused 8-Channel Terminal Block
(1 Power Terminal Plug incl. to disconnect 24V DC Power supply through the 8-Wide I/O Carrier).
SE4002S2T1B2
DO Card: 8 channels 120V/230V AC, High Side, 8-Channel Terminal Block
(1 Power Terminal Plug incl. for dedicated Power supply through the 8-Wide I/O Carrier).
SE4002S2T2B1
DO Card: 8 channels 120V/230V AC, High Side, Fused 8-Channel Terminal Block
(1 Power Terminal Plug incl. for dedicated Power supply through the 8-Wide I/O Carrier).
SE4002S2T2B2
DeltaV™ SQ Controller SE3008
S-series Serial Interface
S-series Serial Interface Card, 2-ports
(includes 1 Interface Card and a simplex Terminal Block)
SE4006P2
Redundant S-series Serial Interface Card, 2-ports
(includes 2 Interface Cards and a redundant Terminal Block)
SE4036P2
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,