1747-L551 Module Rockwell SLC Central Controller
Memory (words) 16 K
I/O capacity,
max
4096 discrete inputs/4096 discrete outputs
Local system,
max
3 chassis / 30 slots
Programming
instructions
107
Typical scan
time(1)
(1) The scan times are typical for a 1 K ladder logic program consisting of simple ladder logic and communication servicing.
Actual scan times depend on your program size, instructions used, and the communication protocol.
1 ms/K 0.9 ms/K
Bit execution
(XIC)
0.44 μs 0.37 μs
Programming
software
SLC 5/03s and SLC 5/04s: RSLogix 500,
SLC 5/05s: RSLogix 500
Power supply loading at 5V dc 500 mA for the SLC 5/03 processor
1.0 A for the SLC 5/04 and 5/05 processors
Power supply loading at 24V dc 175 mA for the SLC 5/03 processor
0 mA for the SLC 5/04 processor (1)
(1) SLC 5/04 Processors manufactured prior to April 2002 draw 200 mA at 24V dc. Check your label to verify your processor’s
current draw.
0 mA for the SLC 5/05 processor
Communication options for the SLC 5/03, 5/04, and 5/05 processors are as follows:
• DH485
• RS-232 protocols (DF1 Full-duplex, DF1 Half-duplex master/slave, DF1
Radio Modem, DH-485, or ASCII)
• Data Highway Plus (A ControlLogix Gateway is required for the SLC 5/03
and SLC 5/05 processors.)
• Ethernet TCP/IP (A 1761-NET-ENI interface module is required for the SLC
5/03 and SLC 5/04 processors)
• ControlNet (via a 1747-KFC15 module)
• DeviceNet (via a 1761-NET-DNI interface module)
1747-L511 Module Rockwell CPU Controller
1747-L514 Module Rockwell CPU Controller
1747-L524 Module Rockwell CPU Controller
1747-L531 Module Rockwell CPU Controller
1747-L532 Module Rockwell CPU Controller
1747-L533 Module Rockwell CPU Controller
1747-L541 Module Rockwell CPU Controller
1747-L542 Module Rockwell CPU Controller
1747-L543 Module Rockwell CPU Controller
1747-L551 Module Rockwell SLC Central Controller
1747-L552 Module Rockwell SLC Central Controller
1747-L553 Module Rockwell SLC Central Controller
l***= (VIP) 2022-04-09 08:20:58
Very good friend, recommend to everyone!
Mall Customer Service >2022-04-09 08:21:16
Thanks!
l***= (VIP) 2022-04-09 08:19:46
Can any contact information on the website contact you?
Mall Customer Service >2022-04-09 08:20:20
Of course, we'd love to help you!
l***= (VIP) 2022-04-09 08:16:30
Hello, our product cannot be started, the red light is always on? Can you tell me why? We communicate in English
Mall Customer Service >2022-04-09 08:17:22
Of course, please send an email with a video or photo of the product you are using.
l***= (VIP) 2022-04-09 08:15:31
مرحبًا ، لا يمكن بدء تشغيل منتجنا ، فالضوء الأحمر مضاء دائمًا؟ هل تستطيع ان تقول لي لماذا؟
Mall Customer Service >2022-04-09 08:15:52
yes
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
Region Email:
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,