GE IC695CPU320/CRU320 Models
Program storage Up to 64 Mbytes of battery-backed RAM 64 Mbyte of non-volatile flash user memory
Power requirements +3.3 VDC: 1.0 Amps nominal +5 VDC: 1.2 Amps nominal
Operating Temperature 0 to 60°C (32°F to 140°F)
Floating point Yes
Boolean execution speed, typical 0.047 ms per 1000 Boolean instructions
Time of Day Clock accuracy Maximum drift of ±2 seconds per day. Can be synchronized to an Ethernet time master within ±2ms of the SNTP time stamp.
Elapsed Time Clock (internal timing) accuracy ±0.01% maximum
Embedded communications RS-232, RS-485
Serial Protocols supported Modbus RTU Slave, SNP, Serial I/O
Backplane Dual backplane bus support: RX3i PCI and 90-30-style serial
PCI compatibility System designed to be electrically compliant with PCI 2.2 standard
Program blocks Up to 512 program blocks. Maximum size for a block is 128KB.
Flash memory endurance rating 100,000 write/erase cycles minimum
Memory (For a detailed listing of memory areas, refer to chapter 7.) %I and %Q: 32Kbits for discrete %AI and %AQ: configurable up to 32Kwords %W: configurable up to the maximum available user RAM Managed memory (Symbolic and I/O variables combined): configurable up to 64 Mbytes
l***= (VIP) 2021-12-26 00:51:35
你好,请问有没有这个产品的编程手册?
Mall Customer Service >2021-12-26 00:52:46
你好,有的,请通过网站任何联系方式,对接客服。有专人和您对接。
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,