SIPLUS NET SCALANCE X204-2
6AG1204-2BB10-4AA3 SIPLUS NET SCALANCE X204-2
SIPLUS NET SCALANCE X204-2 based on 6GK5204-2BB10-2AA3 with conformal coating, -40…+60 °C, managed IE switch, 4x 10/100 Mbps RJ45 ports, 2x 100 Mbps multimode BFOC, LED diagnostics, error signaling contact with set pushbutton, redundant power supply PROFINET IO device, network management, integrated redundancy manager, incl. electronic manual on CD-ROM, C-Plug optional
A5E00296591
A5E00296593
A5E00296597
A5E00296598
A5E00296599
A5E00297363
A5E00297369
A5E00297971
A5E00299353
A5E00299845
A5E00299847
A5E00302916
A5E00308869
A5E00308871
A5E00313822
A5E00313831
A5E00313836
A5E00313839
A5E00328894
A5E00328895
A5E00328896
A5E00328897
A5E00328898
A5E00328899
A5E00328900
A5E00328902
A5E00328903
A5E00328905
A5E00328906
A5E00328907
A5E00328908
A5E00328909
A5E00328910
A5E00328911
A5E00354268
A5E00354269
A5E00354270
A5E00354271
A5E00354272
A5E00354273
A5E00354274
A5E00354275
A5E00378246
A5E00409885
A5E00409929
A5E00409947
A5E00409962
A5E00409966
A5E00410267
A5E00410309
A5E00410321
A5E00410324
A5E00410326
A5E00417394
A5E00417401
A5E00417431
A5E00422610
A5E00429789
A5E00434086
A5E00782865
A5E00782981
A5E00852382
A5E00882121
A5E00891855
A5E01008972
A5E01040317
A5E01058837
A5E01058838
A5E01061561
A5E01061562
A5E01061563
A5E01061564
A5E01061565
A5E01061566
A5E01061567
A5E02176860
A5E02320421
A5E02320422
A5E02320423
A5E02320424
A5E02320425
A5E02320426
A5E02320427
A5E02320428
A5E02320429
A5E02320551
A5E02320552
A5E02320553
A5E02320554
A5E02320555
A5E02320556
A5E02320557
A5E02320558
A5E02320559
A5E02326861
A5E02326863
A5E02408313
A5E02716049
A5E02885374
A5E02951936
A5E02951937
A5E03347537
A5E03347540
A5E03446234
A5E03707235
A5E03707236
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,