LENEL LNL-1320 Dual Reader Interface Module
LENEL LNL-1320 Dual Reader Interface Module
Features & Functionality • 12 or 24 VDC power supply
• Supports Data1/Data0, Clock/Data, Supervised and Unsupervised F2F and OSDP-compatible RS-485 readers and keypads
• Supports Open Supervised Device Protocol (OSDP) readers, including biometric template transfer and Secure Channel encryption
• Downloadable firmware
• Six Form-C 5 A at 28 VDC relay outputs
• Up to 16 different formats
• Issue code support for magnetic and Wiegand formats
• Door contact supervision (open/closed)
• REX push-button monitor
• Strike control output
• Bicolor reader status LED support and 2-wire LED support
• Beeper control
• Dedicated tamper and power failure circuits
• Support for offline reader access mode
• On-board jumpers for termination
• On-board regulator allows 12 VDC reader support from 24 VDC power source
• DIP switch-selectable addressing
• Advanced Encryption Standard (AES) 128-bit algorithm for communications to ISC
• Supports Schlage® Handkey® template download
• Compatible with current and previous versions of OnGuard
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,