2094-AL09, 2094-BL02 Line Interface Module
Catalog Numbers 2094-AL15S, 2094-AL25S, 2094-AL50S, 2094-AL75S, 2094-BL10S, 2094-BL25S, 2094-BL50S, 2094-BL75S, 2094-XL75S-C1, 2094-XL75S-C2, 2094-AL09, 2094-BL02
Cat. No. Input Voltage Current Rating Description 2094-AL15S 230V 15 A
• 230V AC auxiliary power output. • Customer-configurable branch-circuit protection. This feature provides the option for connecting CB2 and CB3 before or after the main (CB1) disconnect. See Configure Branch-circuit Protection on page 40 for more information.
• 24V DC power output with 20 A current capacity. • Branch circuit protection and disconnect when used with the variable-depth rotary mechanism (catalog number 140G-G-RVM12B). • Power to multiple Bulletin 2093 or 2094 power rails.
• Internal 24V DC I/O line filter. • Internal 230V AC control line filter. • External (customer supplied) 3-phase line filter. 2094-AL25S 25 A 2094-AL50S 50 A 2094-AL75S 75 A 2094-BL10S 460V 10 A 2094-BL25S 25 A 2094-BL50S 50 A 2094-BL75S 75 A 2094-XL75S-C1 230/460V 75 A 110V AC auxiliary power input. 2094-XL75S-C2 230/460V 75 A 230V AC auxiliary power input. 2094-AL09 230V 20 A • 24V DC power output with 8 A current capacity. • Internal 3-phase line filter. 2094-BL02 460V 30 A • Internal 230V AC control line filter.
Delivery:
Warranty:
All our products are covered by our own warranty.
Payment method:
Quick Quote: Receive price and availability today!
Replacing an electrical equipment unit in a plant is a complex task that requires careful planning and execution to ensure safety and minimize downtime. Here is a general step-by-step guide on how to replace electrical equipment in a plant:
Pre-Planning:
Safety Precautions:
Shutdown Procedures:
Disconnection:
Removal of Existing Equipment:
Installation of New Equipment:
Testing and Commissioning:
Documentation:
Training:
Startup:
Throughout the process, it’s important to work closely with a team that includes electrical engineers, technicians, and maintenance staff. Communication is key to a successful equipment replacement. Additionally, always adhere to local electrical codes and standards to ensure compliance and safety. If the task is beyond the expertise of in-house staff, consider hiring a professional contractor experienced in industrial electrical work.
Obtaining industrial automation programming software typically involves the following steps:
Identify Your Needs:
Research Software Options:
Contact Equipment Manufacturers:
Purchase or Download:
Academic or Evaluation Versions:
Open Source Options:
Licensing:
Training and Support:
Legal and Compliance:
Installation and Setup:
Here are some common ways to obtain industrial automation programming software:
Remember to keep your software updated to benefit from the latest features and security patches. Also, ensure that you have the necessary backup and recovery procedures in place to protect your programming work.
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,