8VZZ004865L0325 ABB H&B Contronic
Note : Almost one common + and one commun – on each plug-in base ECZ have to be connected to the power supply.
When switching high current loads, use many commun + terminal to avoid damage to the base.
CAUTION : The common – is internaly connected to the earth terminal.
Note : In case of use of an external power supply 24 VDC for inputs, the "24" VDC has to be connected to the common "+".
Caution : if the 24 VDC is connected to common "+", the remote unit can be supplied by the external power supply even if the main power supply is OFF.
● Initialization
After configured and wired the unit :
– the unit initializes itself after power On.
– the error led goes out after initialization.
– the status of 8 inputs is displayed on the 16 led's.
For the PC board 07 CM 90 and the coupler boards 07 CS 61 and 35 CS 91, refer to their own description
3BSE013237R1
TU836V1 Extended MTU, 250V, Fused
3BSE013238R1
TU837V1 Extended MTU, 250V, Fused
3BSE013250R1
DO821 Digital Output Relay 8 ch
3BSE013258R1
DO815 Digital Output 24V 8 ch
3BSE013281R1
TC514V2 AF 100 Twisted pair/opto modem
3BSE013284R1
TC515V2 AF100 Twisted pair to twisted
3BSE014162R1
DSAI 155A 14ch Thermo Couple module
3BSE014666R1
CI541V1 Profibus Interface Submodule
3BSE016034R1
Basic SW PROFIBUS-DP Licence
3BSE016258R1
Locking Device Cyl. RM500
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2024 Copyrighted
Phone(WeChat/Whatsapp)
+086-18144100983
No 1134 Jimei North Road, Jimei District
Hong Kong Office:
Guan Tang District, Hong Kong,