GE announced that it has completed the acquisition of Alstom’s power and grid businesses. The completion of the transaction follows the regulatory approval of the deal in over 20 countries and regions including the EU, U.S., China, India, Japan and Brazil. It is GE’s largest-ever industrial acquisition.
GE reached an agreement with Alstom in 2014 to purchase Alstom’s power and grid businesses for €12.35 billion. Adjusting for the joint ventures announced in June 2014 (renewables, grid, and nuclear), changes in the deal structure, price adjustments for remedies, net cash at close, and including the effects of currency, the purchase price is €9.7B (approximately $10.6B). This includes working capital usage of approximately €0.6B in the month of October. GE expects the deal to generate $0.05-0.08 of earnings per share in 2016 and $0.15-0.20 of earnings per share by 2018. GE is targeting $3.0 billion in cost synergies in year five and strong deal returns. The overall economics and strategic rationale remain the same as GE announced in April 2014.
“The completion of the Alstom power and grid acquisition is another significant step in GE’s transformation,” said Jeff Immelt, chairman and CEO, GE. “The complementary technology, global capability, installed base, and talent of Alstom will further our core industrial growth. We are open for business and ready to deliver one of the most comprehensive technology offerings in the energy sector for our customers.”
Customers will realize immediate benefit from the combination of GE and Alstom, including these current projects:
- PSEG Sewaren (New Jersey combined cycle power plant): GE 7HA gas turbine + Alstom heat recovery steam generator (HRSG)
- Punjab Pakistan Bhikki (Pakistan combined cycle power plant): two GE 9HA gas turbines + Alstom steam turbine
- Exelon Power Plants (Texas power projects): four GE 7HA gas turbines + four Alstom HRSGs
- Chempark (Leverkusen, Germany combined heat and power project): GE 9HA gas turbine.
In addition, GE and Alstom are both preferred bidders for a combined cycle plant project in Asia that would use two GE 7HA gas turbines, two Alstom HRSGs and one Alstom steam generator, and Alstom is the preferred bidder for Arabelle steam turbines in two UK nuclear reactors; the preferred bidder for boilers, steam turbines and generators a clean coal project in the Middle East; and has successfully delivered India’s first 800 kV High Voltage Direct Current (HVDC) power transformer for the Champa-Kurukshetra project.
GE also announced today it has completed the sale of its rail signaling business to Alstom for approximately $800 million.
GE continues to execute its strategy to become a simpler, more focused company. In addition to the Alstom acquisition, the split-off of Synchrony Financial has commenced; the GE Capital exit strategy is ahead of plan, with $126 billion of signed dispositions; the recent formation of GE Digital is consolidating all digital capabilities across the company to provide customers with the best industrial solutions and software; and GE is winning in the marketplace and delivering strong financial results.
About GE
GE (NYSE: GE) is the world’s Digital Industrial Company, transforming industry with software-defined machines and solutions that are connected, responsive and predictive. GE is organized around a global exchange of knowledge, the "GE Store," through which each business shares and accesses the same technology, markets, structure and intellect. Each invention further fuels innovation and application across our industrial sectors. With people, services, technology and scale, GE delivers better outcomes for customers by speaking the language of industry.
First, the importance of industrial equipment installation
In modern industrial production, various equipment and machines are widely used in various fields, such as manufacturing, energy industry, chemical industry and so on. The installation of industrial equipment is directly related to production efficiency and product quality. Proper installation and commissioning of good equipment can ensure the stable operation of the production line, improve production efficiency and product quality, reduce maintenance costs, and ensure the safety of employees.
Second, the steps of industrial equipment installation
1. Preparation: Before the installation of industrial equipment, it is necessary to carry out adequate preparation work. This includes the tools and equipment required for installation, cleaning and preparation of the installation site, and making installation plans and schedules.
2. Determine the installation position: Determine the installation position of the equipment according to the requirements of the equipment and the layout of the production line. When determining the location, the weight and size of the equipment need to be considered, as well as the coordination of the equipment with the surrounding environment.
3. Install the device: Assemble and install the device according to the installation instructions. Ensure that the device is securely and accurately connected, while protecting the appearance and internal components of the device.
4. Connect power supplies and pipelines: For devices that require power supplies and power supplies, properly connect power supplies and pipelines. The connection of power supply and pipeline should comply with safety standards to avoid hazards such as electric shock and leakage.
5. Commissioning the device: After the installation is complete, you need to commission the device to ensure that the device can run properly. It includes checking the functions and performance of the equipment, adjusting the parameters and Settings of the equipment, and carrying out the necessary tests and inspections.
6. Training operators: After the installation of the equipment, it is necessary to train the operators to understand the operation methods and precautions of the equipment, and improve the operation skills and safety awareness of the employees.
Third, industrial equipment installation precautions
1. Safety first: When installing industrial equipment, safety is the most important consideration. You must operate in strict accordance with safety regulations and wear necessary protective equipment to ensure the safety of the workplace.
2. Strictly follow the equipment instructions: Industrial equipment usually comes with detailed installation instructions, you must carefully read and understand the contents of the instructions, and install the operation in accordance with the requirements of the instructions.
3. Pay attention to the assembly sequence: When installing the device, follow the correct assembly sequence to ensure that all components of the device are assembled correctly to avoid equipment failures or safety accidents caused by incorrect assembly sequence.
GE Panametrics MMS35-321-1-00 0 Moisture Monitor, FOR PARTS/ REPAIR |
GE PANAMETRICS O2X1 TRANSMITTER |
GE Panametrics M Series Moisture Probe M2LW-T0-000 |
GE Panametrics UTXDR 4 MHz ultrasonic transducer flow meter |
GE PANAMETRICS 25DL-HP 25DL Ultrasonic Thickness NDT Gauge |
NEW GE PANAMETRICS AT 868 AQUA TRANS FLOWMETER AT868W-1-1-1-1 85/265VAC |
NEW GE M2LR-0G-000-0 Panametrics M Series Moisture Probe Serial # 452869-PR |
GE PANAMETRICS PM880 PORTABLE HYGROMETER MOISTURE ANALYZERS INCLUDING CHARGER |
GE PANAMETRICS C-PT-10-B-EX-0 |
1~16FT BNC male to male NDT Cable For GE Panametrics Krautkramer Flaw Detector |
Panametrics Model 35 DL PMT Ultrasonic Thickness Gage |
GE PANAMETRICS 25DL-RR 25DL Ultrasonic Thickness NDT Gauge |
GE Panametrics TransPort PT878 PORTABLE LIQUID FLOWMETER WORKING |
GE Panametrics Moisture Image Series1 710-1160 rev C |
GE Panametrics Hygrometer Moisture Monitor Series 3 AIT-5202 PO,OB-28118-00 |
GE PANAMETRICS XMT868 FLOW TRANSMITTER XMT868-1-12-FT -0012 |
GE PANAMETRICS O2X1 TRANSMITTER MAX OPERATING VOLTAGE 28VDC S/N 1353E |
GE Panametrics C-RS-10-MB Transducers C-RS-402 0887 |
General Electric Ge Panametrics Mms35-341-1-10 0 Moisture Monitor Series 35 12W |
16180) [] GE Panametrics MTS5-351-10-S |
GE PT878 Panametrics Liquid Flowmeter W/ 2x Kanetec MB-PR and 2x CRS-10-MB |
Kastar 6V 3000mAh Battery for GE 200-081 TEB-200-081 Panametrics PT878 Flowmeter |
GE Panametrics PT868 Portable Flowmeter |
GE System Board for MIS1 Series 1 MIS1-2012911 Panametrics 710-1159 Rev A |
Dual Plug Subvis to BNC Ultrasonic 2~10M Twinax Cable For NDT GE Panametrics |
GE PANAMETRICS O2X1 Transmitter |
GE GENERAL ELECTRIC PANAMETRICS PANAFLOW TRANSDUCER T14-18-10-STD- HT-TI PROBE |
GE PANAMETRICS 710-1141 REV : B |
GE PANAMETRICS C-PT-10-N-B-00 -0 |
GE PANAMETRICS #AT868-1-1-1-0 AQUA TRANS FLOWMETER |
GE Sensing Panametrics PRE 868-1-20 Console Module |
10-32 Microdot Elbow to BNC Male 2~10M Cable For NDT GE Panametrics Krautkramer |
GE Panametrics 26MG-XT Ultrasonic Thickness Gage |
GE PANAMETRICS 703-1358-02 MODBUS OPTION CARD FOR DF868/GX868 FLOWMETERS |
Panametrics MISP2 GE Sensing Probe |
GE Panametrics TransPort PT878 Ultrasonic FlowMeter from Japan |
GE Panametrics MIS2-241-1-140 0 Moisture Image Series-2 Analyser Analyzer Logger |
GE DigitalFlow XMT868I-1-11-T I-0317-0 Panametrics Ultrasonic Liquid Transmitter |
GE PANAMETRICS 703-1403-02 UNIVERSAL AC POWER SUPPLY UNIPOLAR |
GE Panametrics TransPort PT878 PORTABLE LIQUID FLOWMETER |
GE Panametrics oxy.IQ OXY.IQ-110-00 Oxygen Transmitter |
All new products and surplus products of the industrial intelligence industry, as well as the discontinued products of the original manufacturers. We are not an authorized distributor or representative of any of the above manufacturers (except for brand authorization). The trademarks, brand names and brands appearing in this agreement are the property of their respective manufacturers.
COPYRIGHT© 2003-2025 Copyrighted
Phone(WeChat/Whatsapp)
+086-181 4410 0983
No 1134 Jimei North Road,
Hong Kong Office:
Guan Tang District, Hong Kong,